Skip to content
free
K
1
2
practice
Home
Math
English
Science
Social Studies
Contact
Language
English
Español
Sign In
/
Social Studies
/
Grade 5
/
Resources and Production
Worksheet
Grade Level
Grade 5
5.53 Resources and Production
0%
Skill Level
🔴 Hard
00:00
Progress to Next Level
25% to Medium
Easy
Medium
Hard
Mastery
100%
Passage
A student can make 8 origami cranes per hour. She has 12 sheets of paper, and each crane needs 1 sheet.
If she works for 2 hours, what limits how many cranes she can produce?
A
Time limits production to 16 cranes.
B
Paper limits production to 12 cranes.
C
Skill limits production to 8 cranes total.
D
Nothing limits production; she can make more than 16 cranes.
Submit Answer